Turin Venice High Speed ​​Railway Line, Milan – Verona section

Trans-European TEN-T "Mediterranean" corridor

The project involved the construction of 7 viaducts, 9 artificial tunnels, 7 overpasses, 34 underpasses, 46 km of embankment and 1.1 km of trenches, 17.5 km of extra-line roads, and a length of 205,600 ml.

Preliminary, definitive, executive design and construction of the Turin Venice high-speed railway line, Milan-Verona section, turnkey contract – years 2004-2005
The new High Speed ​​/ High Capacity line is an integral part of the Trans-European TEN-T “Mediterranean” Corridor and consists of a total of 140 km, already operating the 27 km between Milan and Treviglio since 2007

YEAR2004 – 2005
CLIENT: TAV s.p.a. Treno Alta Velocità, Roma – Italferr Sis. T.A.V s.p.a. Alta Sorveglianza – Roma, Italia -Saipem s.p.a. – Fioroni Sistema s.p.a. – Consorzio CEPAV DUE, Consorzio ENI per l’Alta Velocità (Snamprogetti, Saipem, Fioroni Sistema, Ferrocemento, Maltauro, Todini, Aquater) – Milano, Italia.
PROJECT VALUE: € 5 mld
SERVICE: Final Design Check, Project Management, Project Coordination, Cost Time Comparison
COUNTRY: Lombardia – Veneto

Close Menu